SECTION .0400 ‑ POST‑EVALUATION PROCEDURES

 

01 NCAC 30F .0401          POST‑OCCUPANCY EVALUATION

Following project close‑out, the prime contractor is often required to take remedial action to correct discrepancies which fall under product or construction warranty. While this phase of the project normally proceeds without serious difficulty, Capital Projects Coordinators may at their option, submit a special evaluation during the contract warranty period if circumstances dictate. This special evaluation will involve completion of the optional post‑occupancy evaluation portion of the form but will not normally involve re‑computation of the evaluation(s) assigned for the previous four phases. A new overall contractor evaluation will be assigned which will take into consideration the previously assigned evaluation. If the post‑occupancy contractor evaluation is completed, the contractor being evaluated will be afforded the same opportunity to provide input on the evaluation as was provided on the evaluation made at job construction completion.

 

History Note:        Authority G.S. 143‑135.26(4);

Eff. January 1, 1992;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. July 22, 2018.